ISIMIP2b: CLM4.5 piControl driven runs replaced


Posted by Matthias Büchner on Sept. 14, 2018

CLM4.5 GFDL-ESM2M extended picontrol run (1861-2099) were not kept at a constant, pre-industrial level. Instead, a constant, present-day value of 367 ppmv was used. Those runs were replaced at both, DKRZ storage and ESGF.

This is an update to this caveat entry.